1. Adhesive should be trowelled
on evenly onto walls and floors.
Spread adhesive horizontally when
tiling walls.
2. Tiles are then placed into position
and pressed into the adhesive
by using a slight up and down
movement. Tiles should have an
adhesive covering of at least 80%
3. Once the tile is roughly in position,
remove any excess adhesive and
insert a spacer. Move the tile to
ensure accurate positioning. To
allow removal of tile spacers, avoid
pressing them too far into the joint.
Comments